CertificationAccredited by Kanban University

Kanban System Design Training

22 hours
Max 16 participants

$1,207

Dates being scheduled

About this certification

The Kanban System Design (KSD) training aims to introduce participants to the fundamental principles and practices of Kanban, focusing on designing effective Kanban systems. This training helps professionals understand how to visualize work, limit work in progress (WIP), and improve workflow in various environments, whether technical or non-technical. 

Throughout this training, participants will learn to create Kanban systems tailored to their needs, use key performance indicators (KPIs) to measure workflow efficiency, and integrate a culture of continuous improvement within their teams. Intended for project managers, product owners, development teams, and anyone involved in operations management, this training will enable them to enhance collaboration and optimize value delivery. 

By the end of the training, participants will have acquired the skills needed to implement Kanban systems and leverage its benefits in their professional environment.

Learning objectives

  • Understand Kanban principles and what sets them apart from other agile approaches
  • Map a real workflow and design the matching Kanban board (STATIK)
  • Set work-in-progress limits, classes of service and explicit policies
  • Identify bottlenecks and improve end-to-end flow
  • Choose meaningful metrics and establish the feedback loops of continuous improvement
  • Build an action plan to roll out your Kanban system in your organization

Target audience

  • Project managers looking to structure and improve workflow management
  • Scrum Masters and Agile Coaches wanting to integrate Kanban into their practices
  • Product Owners and Business Analysts seeking to optimize task management and prioritization
  • Team leaders in operations aiming to streamline work and reduce bottlenecks
  • Developers and Agile team members wanting to better understand and apply Kanban
  • Anyone involved in continuous improvement and operations management

Prerequisites

No strict prerequisites, but a basic understanding of Agile concepts and project management methods is recommended. Prior experience with Kanban or similar methodologies is a plus. 

Skills acquired

  • Understand the fundamental principles of Kanban and their application 
  • Design and implement Kanban systems tailored to organizational needs 
  • Visualize work and effectively manage workflow 
  • Identify bottlenecks and apply continuous improvement techniques 
  • Collaborate more effectively within teams and optimize value delivery 

Training programme

  1. Introduction to Kanban 
  2. History and principles of Kanban 
  3. Differences between Kanban and other Agile methods 
  4. Fundamentals of Kanban System Design 
  5. Visualizing work and creating a Kanban board 
  6. Limiting work in progress (WIP) and managing flows 
  7. Optimizing Workflow 
  8. Identifying and resolving bottlenecks 
  9. Continuous improvement techniques: Kaizen and feedback 
  10. Implementing Kanban in Your Organization 
  11. Integration with other Agile methodologies 
  12. Developing metrics and performance indicators 
  13. Case Studies and Practical Workshops 
  14. Applying concepts to real-world scenarios 
  15. Creating a personal action plan 

Frequently asked questions

Who is the Kanban System Design training for?
Project managers looking to structure and improve workflow management · Scrum Masters and Agile Coaches wanting to integrate Kanban into their practices · Product Owners and Business Analysts seeking to optimize task management and prioritization · Team leaders in operations aiming to streamline work and reduce bottlenecks · Developers and Agile team members wanting to better understand and apply Kanban · Anyone involved in continuous improvement and operations management
What are the prerequisites for the Kanban System Design training?
No strict prerequisites, but a basic understanding of Agile concepts and project management methods is recommended. Prior experience with Kanban or similar methodologies is a plus.
How long does the Kanban System Design training last?
The Kanban System Design training represents 22 hours of guided instruction, delivered by an accredited trainer in Montréal or remotely.
What skills does the Kanban System Design training build?
Understand the fundamental principles of Kanban and their application · Design and implement Kanban systems tailored to organizational needs · Visualize work and effectively manage workflow · Identify bottlenecks and apply continuous improvement techniques · Collaborate more effectively within teams and optimize value delivery
Which body issues the Kanban System Design certification?
The certification is issued by Kanban University. Atypix is an accredited training organisation and has been preparing candidates for this exam from Montréal.

Testimonials

“Le cours est à la fois captivant et interactif. De nombreux tests sont intégrés pour évaluer l'acquisition des connaissances. Par ailleurs, il favorise des échanges riches et constructifs entre les étudiants et le formateur. Très heureuse d'avoir pu suivre cette formation.”

Bineta Aissa HANN

“Atypix dispose d'excellents formateurs. Ils vous apportent réellement des conseils professionnels et des trucs et astuces concrets pour passer la certification PSM. En plus de cela, leur gentillesse vous donne un grand sourire tout en travaillant pour faire le travail. Je les recommande fortement!”

Amath DIACK

“Waouh!! Je suis impressionné par la qualité de la formation et la Façon que le formateur arrive à capter l'attention des étudiants durant toute la durée du cours!!!”

Mamadou DIOP

Upcoming sessions

No scheduled session

Get notified →

Need help choosing?

Book a free consultation with our trainer.

Contact us

from

$1,207

Dates being scheduled

See upcoming dates