ISO/IEC 27033 Network Security Training
$1,138
Dates being scheduled



About this certification
Learning objectives
- Master the fundamentals of network security and how the ISO/IEC 27033 standards fit in
- Identify network threats and vulnerabilities: malware, denial-of-service attacks, intrusions
- Assess risk and select the right preventive and reactive security controls
- Design a secure network architecture: segmentation, isolation, defense in depth
- Deploy protection tooling: firewalls, IDS and IPS, logging
- Build an incident response plan and prepare for the ISO/IEC 27033 certification exam
Target audience
- Network engineers and administrators
- Cybersecurity managers and analysts
- Network architects and IT security consultants
- IT managers and Chief Information Officers (CIOs)
- Information security auditors
- Anyone involved in securing network infrastructures
Prerequisites
Skills acquired
- Understand the fundamental concepts of network security
- Identify and assess network threats and vulnerabilities
- Implement appropriate security controls
- Design secure network architectures
- Develop plans for responding to security incidents
- Successfully prepare for the ISO/IEC 27033 certification exam
Training programme
- Introduction to Network Security
- Fundamental concepts of security
- ISO/IEC standards and their significance
- Network Threats and Vulnerabilities
- Types of threats (malware, DDoS attacks, etc.)
- Vulnerability assessment
- Network Security Controls
- Preventive and reactive security measures
- Security tools (firewalls, IDS/IPS, etc.)
- Secure Network Architecture and Design
- Principles of secure design
- Network segmentation and isolation
- Incident Planning and Response
- Developing an incident response plan
- Managing security incidents
- Certification Preparation
- Sample exam questions
- Success strategies for the ISO/IEC 27033 exam
Frequently asked questions
- Who is the ISO/IEC 27033 Network Security training for?
- Network engineers and administrators · Cybersecurity managers and analysts · Network architects and IT security consultants · IT managers and Chief Information Officers (CIOs) · Information security auditors · Anyone involved in securing network infrastructures
- What are the prerequisites for the ISO/IEC 27033 Network Security training?
- Basic knowledge of IT security and network management is recommended. Prior experience in network administration or information system security is a plus.
- How long does the ISO/IEC 27033 Network Security training last?
- The ISO/IEC 27033 Network Security training represents 32 hours of guided instruction, delivered by an accredited trainer in Montréal or remotely.
- What skills does the ISO/IEC 27033 Network Security training build?
- Understand the fundamental concepts of network security · Identify and assess network threats and vulnerabilities · Implement appropriate security controls · Design secure network architectures · Develop plans for responding to security incidents · Successfully prepare for the ISO/IEC 27033 certification exam
- Which body issues the ISO/IEC 27033 Network Security certification?
- The certification is issued by PECB. Atypix is an accredited training organisation and has been preparing candidates for this exam from Montréal.
Testimonials
“Le cours est à la fois captivant et interactif. De nombreux tests sont intégrés pour évaluer l'acquisition des connaissances. Par ailleurs, il favorise des échanges riches et constructifs entre les étudiants et le formateur. Très heureuse d'avoir pu suivre cette formation.”
Bineta Aissa HANN
“Atypix dispose d'excellents formateurs. Ils vous apportent réellement des conseils professionnels et des trucs et astuces concrets pour passer la certification PSM. En plus de cela, leur gentillesse vous donne un grand sourire tout en travaillant pour faire le travail. Je les recommande fortement!”
Amath DIACK
“Waouh!! Je suis impressionné par la qualité de la formation et la Façon que le formateur arrive à capter l'attention des étudiants durant toute la durée du cours!!!”
Mamadou DIOP
Upcoming sessions
No scheduled session
Get notified →Where this course is delivered
In person at our offices, or remotely.
from
$1,138
Dates being scheduled