CertificationAccredited by Cisco

CCNP Enterprise Training

25 hours
Max 10 participants

$1,312

Dates being scheduled

CCNP Enterprise
Cisco
CCNP Enterprise

About this certification

The CCNP Enterprise certification is designed for IT professionals looking to deepen their networking and infrastructure management skills. This training program enables participants to master the key technologies used in modern enterprise networks, including wireless networks, security, and performance management. 

Throughout this training, participants will gain practical knowledge of network architecture, advanced routing and switching, as well as implementing performance management solutions. The skills acquired will enable professionals to design, deploy, secure, and troubleshoot enterprise networks. 

This training is aimed at network engineers, system administrators, and IT professionals with prior networking experience who wish to prepare for the CCNP Enterprise certification exam, a valuable asset in the ever-evolving tech industry. 

Learning objectives

  • Master modern enterprise network architecture and its underlying protocols
  • Implement advanced routing and switching: OSPF, EIGRP, BGP, VLANs, Spanning Tree
  • Deploy network security policies and effective access control
  • Design and secure enterprise wireless networks
  • Monitor, analyze and optimize network performance and troubleshoot incidents
  • Prepare for the Cisco CCNP Enterprise certification exam

Target audience

  • Network engineers looking to deepen their expertise in enterprise network infrastructure and management
  • System administrators aiming to strengthen their skills in advanced routing, switching, and network security
  • IT professionals with prior networking knowledge (ideally with a CCNA certification or equivalent experience) seeking career advancement
  • Security and network management consultants wanting to master advanced technologies and optimize infrastructure performance
  • Anyone preparing for the CCNP Enterprise certification exam to validate their expertise and enhance their career opportunities in networking

Prerequisites

A basic understanding of networking concepts is recommended. It is advised to have obtained the Cisco CCNA certification or have equivalent networking experience before taking this training.

Skills acquired

  •  Understand enterprise network architecture and associated protocols 
  •  Master advanced routing and switching techniques 
  •  Implement effective network security solutions 
  •  Design and deploy secure wireless networks 
  •  Analyze and optimize performance of enterprise networks 
  •  Successfully prepare for the CCNP Enterprise exam 

Training programme

  1. Introduction to Enterprise Networks 
  2. Basic network concepts and architecture 
  3. OSI and TCP/IP models 
  4. Advanced Routing and Switching 
  5. Routing protocols: OSPF, EIGRP, BGP 
  6. VLANs, Spanning Tree Protocol, and inter-VLAN routing 
  7. Network Security 
  8. Basic network security concepts 
  9. Implementing security policies and access control 
  10. Wireless Networking 
  11. Wi-Fi standards and best deployment practices 
  12. Wireless network security 
  13. Network Performance Management 
  14. Monitoring and analysis tools for networks 
  15. Optimization and troubleshooting of network performance 
  16. CCNP Enterprise Exam Preparation 
  17. Sample exam questions 
  18. Strategies and tips for passing the exam 

Frequently asked questions

Who is the CCNP Enterprise training for?
Network engineers looking to deepen their expertise in enterprise network infrastructure and management · System administrators aiming to strengthen their skills in advanced routing, switching, and network security · IT professionals with prior networking knowledge (ideally with a CCNA certification or equivalent experience) seeking career advancement · Security and network management consultants wanting to master advanced technologies and optimize infrastructure performance · Anyone preparing for the CCNP Enterprise certification exam to validate their expertise and enhance their career oppor…
What are the prerequisites for the CCNP Enterprise training?
A basic understanding of networking concepts is recommended. It is advised to have obtained the Cisco CCNA certification or have equivalent networking experience before taking this training.
How long does the CCNP Enterprise training last?
The CCNP Enterprise training represents 25 hours of guided instruction, delivered by an accredited trainer in Montréal or remotely.
What skills does the CCNP Enterprise training build?
Understand enterprise network architecture and associated protocols · Master advanced routing and switching techniques · Implement effective network security solutions · Design and deploy secure wireless networks · Analyze and optimize performance of enterprise networks · Successfully prepare for the CCNP Enterprise exam
Which body issues the CCNP Enterprise certification?
The certification is issued by Cisco. Atypix is an accredited training organisation and has been preparing candidates for this exam from Montréal.

Testimonials

“Le cours est à la fois captivant et interactif. De nombreux tests sont intégrés pour évaluer l'acquisition des connaissances. Par ailleurs, il favorise des échanges riches et constructifs entre les étudiants et le formateur. Très heureuse d'avoir pu suivre cette formation.”

Bineta Aissa HANN

“Atypix dispose d'excellents formateurs. Ils vous apportent réellement des conseils professionnels et des trucs et astuces concrets pour passer la certification PSM. En plus de cela, leur gentillesse vous donne un grand sourire tout en travaillant pour faire le travail. Je les recommande fortement!”

Amath DIACK

“Waouh!! Je suis impressionné par la qualité de la formation et la Façon que le formateur arrive à capter l'attention des étudiants durant toute la durée du cours!!!”

Mamadou DIOP

Upcoming sessions

No scheduled session

Get notified →

Where this course is delivered

In person at our offices, or remotely.

Need help choosing?

Book a free consultation with our trainer.

Contact us

from

$1,312

Dates being scheduled

See upcoming dates