CertificationAccredited by Cisco

CCNP Data Center Training

27 hours
Max 15 participants

$1,189

Dates being scheduled

CCNP Data Center
Cisco
CCNP Data Center

About this certification

The CCNP Data Center certification is designed for IT professionals seeking to deepen their skills in designing, deploying, and managing data center infrastructures. This training covers a wide range of technologies and concepts, including data center architecture, networking, storage, virtualization, and security solutions. 

Participants will gain practical skills to implement solutions tailored to modern data center environments. Through a combination of theoretical and hands-on learning, this training will enable professionals to tackle challenges related to data center management and improve operational efficiency. 

This certification is aimed at network engineers, system administrators, and IT managers looking to validate their expertise and advance their careers by acquiring essential skills in the data center domain. At the end of the training, participants will be well-prepared to take the CCNP Data Center certification exam. 

Learning objectives

  • Design a data center architecture that follows industry best practices
  • Implement data center network connectivity and integrate physical and virtual networks
  • Deploy and administer SAN and NAS storage solutions and backup policies
  • Apply server and storage virtualization and resource orchestration technologies
  • Secure the infrastructure and virtualized environments and meet compliance requirements
  • Prepare for the Cisco CCNP Data Center certification exam

Target audience

  • IT professionals looking to specialize in designing and managing data center infrastructures
  • Network engineers, system administrators, and IT managers wanting to deepen their skills in data center management
  • IT professionals seeking to gain expertise in data center architecture, networking, storage, virtualization, and security
  • Businesses and organizations looking to train staff to manage data center infrastructures efficiently
  • Individuals preparing for the CCNP Data Center certification exam to validate their expertise in the field

Prerequisites

Candidates should have prior knowledge of fundamental networking and systems concepts, as well as practical experience in configuring and managing networking equipment. A CCNA certification or equivalent experience is recommended. 

Skills acquired

  • Design and implement effective data center architectures 
  • Manage network connectivity and optimize performance 
  • Implement storage and data management solutions 
  • Apply virtualization and orchestration technologies 
  • Strengthen security for data center infrastructures 
  • Successfully prepare for the CCNP Data Center exam 

Training programme

  1. Introduction to Data Centers 
  2. Data center architecture and components 
  3. Best practices for data center design 
  4. Data Center Networking and Connectivity 
  5. Routing and switching protocols 
  6. Integration of virtual and physical networks 
  7. Storage and Data Management 
  8. SAN and NAS storage solutions 
  9. Data management and backup strategies 
  10. Virtualization and Orchestration 
  11. Server and storage virtualization technologies 
  12. Resource management and orchestration tools 
  13. Data Center Security 
  14. Security strategies and compliance 
  15. Securing virtualized environments 
  16. Exam Preparation for CCNP Data Center 
  17. Sample questions and case studies 
  18. Success strategies for passing the exam 

Frequently asked questions

Who is the CCNP Data Center training for?
IT professionals looking to specialize in designing and managing data center infrastructures · Network engineers, system administrators, and IT managers wanting to deepen their skills in data center management · IT professionals seeking to gain expertise in data center architecture, networking, storage, virtualization, and security · Businesses and organizations looking to train staff to manage data center infrastructures efficiently · Individuals preparing for the CCNP Data Center certification exam to validate their expertise in the field
What are the prerequisites for the CCNP Data Center training?
Candidates should have prior knowledge of fundamental networking and systems concepts, as well as practical experience in configuring and managing networking equipment. A CCNA certification or equivalent experience is recommended.
How long does the CCNP Data Center training last?
The CCNP Data Center training represents 27 hours of guided instruction, delivered by an accredited trainer in Montréal or remotely.
What skills does the CCNP Data Center training build?
Design and implement effective data center architectures · Manage network connectivity and optimize performance · Implement storage and data management solutions · Apply virtualization and orchestration technologies · Strengthen security for data center infrastructures · Successfully prepare for the CCNP Data Center exam
Which body issues the CCNP Data Center certification?
The certification is issued by Cisco. Atypix is an accredited training organisation and has been preparing candidates for this exam from Montréal.

Testimonials

“Le cours est à la fois captivant et interactif. De nombreux tests sont intégrés pour évaluer l'acquisition des connaissances. Par ailleurs, il favorise des échanges riches et constructifs entre les étudiants et le formateur. Très heureuse d'avoir pu suivre cette formation.”

Bineta Aissa HANN

“Atypix dispose d'excellents formateurs. Ils vous apportent réellement des conseils professionnels et des trucs et astuces concrets pour passer la certification PSM. En plus de cela, leur gentillesse vous donne un grand sourire tout en travaillant pour faire le travail. Je les recommande fortement!”

Amath DIACK

“Waouh!! Je suis impressionné par la qualité de la formation et la Façon que le formateur arrive à capter l'attention des étudiants durant toute la durée du cours!!!”

Mamadou DIOP

Upcoming sessions

No scheduled session

Get notified →

Need help choosing?

Book a free consultation with our trainer.

Contact us

from

$1,189

Dates being scheduled

See upcoming dates