Figure Approaches: Development Life Cycle Selection for Exam

Figure Approaches: Development Life Cycle Selection for Exam

PMBOK v8 Definition

Figure Approaches in PMBOK v8 refer to the visual representations of development approaches across a spectrum, ranging from predictive (waterfall) to adaptive (agile) life cycles. These figures illustrate how variables like cost, scope, and time are impacted differently depending on the approach selected, and show the constraint options available for adaptive approaches, including fixed time, fixed scope, or fixed budget.

Why It Matters for the Exam

Development approach selection is frequently tested on the PMI exam because it directly influences how the project is planned, executed, and controlled. Expect situational questions where you must identify the appropriate approach based on project characteristics, and questions asking you to recognize which constraints are typically fixed in adaptive versus predictive environments.

Key Points to Remember (for the exam)

  • Spectrum of Approaches: Development approaches exist on a continuum from predictive to adaptive, with hybrid approaches in between—there is no single "correct" approach for all projects
  • Variable Impact Over Time: Cost of changes and risk increase exponentially over time in predictive approaches, while adaptive approaches keep these variables more constant throughout the project
  • Constraint Options for Adaptive: In adaptive approaches, the project team typically fixes time and cost while allowing scope to vary, unlike predictive where scope is fixed
  • Predictive Life Cycle: Characterized by sequential phases (requirements, design, build, test, deploy) with detailed planning upfront
  • Adaptive Life Cycle: Iterative and incremental delivery with evolving requirements and frequent feedback loops
  • Hybrid Approaches: Can be used simultaneously (adaptive component within predictive) or sequentially (adaptive development followed by predictive rollout)
  • Common Confusion: Many candidates confuse "incremental delivery" within a predictive life cycle with a fully adaptive approach—incremental delivery can exist in predictive projects

Typical PMI Exam Example

A project manager is leading a software development project with clearly defined regulatory requirements but uncertain user interface preferences. The team needs to deliver core compliance features on a fixed date while iterating on the user experience. Which development approach combination would the PMBOK v8 recommend?

Answer: A largely predictive approach with an adaptive component (Figure 4-10), where the compliance requirements follow a predictive life cycle and the UI development uses adaptive methods.

PMI Exam Traps

  • Trap: Confusing "predictive with incremental delivery" (Figure 4-5) with fully adaptive approaches

  • Reality: Predictive with incremental delivery still plans the entire scope upfront but delivers in batches; adaptive approaches evolve scope continuously

  • Trap: Believing adaptive approaches have no planning

  • Reality: Adaptive approaches plan iteratively—just-in-time planning rather than upfront detailed planning

  • Trap: Assuming hybrid means 50% predictive and 50% adaptive

  • Reality: Hybrid can be predominantly predictive with an adaptive component (Figure 4-10) or predominantly adaptive with a predictive component (Figure 4-11)

  • Trap: Thinking all projects must use one approach exclusively

  • Reality: PMBOK v8 explicitly shows approaches can be used simultaneously (Figure 4-9) or sequentially (Figure 4-8)

Important PMI Connections

Related ConceptRelationship TypeExam Attention Point
Project Boundaries (Figure 4-12)Defines scope of approachApproach selection determines how boundaries are managed
Focus Area Interactions (Figure 4-13)Implementation contextPredictive approaches have different focus area interactions than adaptive
Project Management Mindset (Figure 3-1)Foundation for approach selectionMindset principles (holistic view, value focus) guide approach choice
Quality Embedding (Figure 3-4)Affected by approachAdaptive approaches embed quality continuously; predictive uses phase-gate reviews

Quick Review Questions

  1. According to Figure 4-1, how does the impact of variables (cost of changes, stakeholder influence, risk) change over time in a predictive approach compared to an adaptive approach?

  2. In an adaptive development approach, which three constraints are typically considered flexible versus fixed, according to Figure 4-3?

  3. A project uses adaptive development for the first six months followed by a predictive rollout for deployment. Which PMBOK v8 figure illustrates this approach?

  4. What is the key difference between Figure 4-4 (Sample Predictive Life Cycle) and Figure 4-5 (Sample Predictive Life Cycle With Incremental Delivery)?

  5. When a project simultaneously uses adaptive methods for one component and predictive methods for another (Figure 4-9), what is this approach called?

PMBOK v8 Reference

Section 4 – Development Approach and Life Cycle Performance Domain Figures 4-1 through 4-13, specifically:

  • Figure 4-1: Impact of Variables Over Time
  • Figure 4-2: The Spectrum of Development Approaches
  • Figure 4-3: Constraint Options for Adaptive Approaches
  • Figure 4-4: Sample Predictive Life Cycle
  • Figure 4-5: Sample Predictive Life Cycle With an Incremental Delivery
  • Figure 4-6: Life Cycle With an Adaptive Development Approach
  • Figure 4-8: Adaptive Development Followed by a Predictive Rollout
  • Figure 4-9: A Hybrid of Adaptive and Predictive Approaches Used Simultaneously
  • Figure 4-10: A Largely Predictive Approach With an Adaptive Component
  • Figure 4-11: A Largely Adaptive Approach With a Predictive Component