Complete guide

DASM certification: the complete guide

PMI's Disciplined Agile Scrum Master certification, open to all, its online exam, price and how to prepare in French, in Africa and Canada.

What is the DASM?

The DASM (Disciplined Agile Scrum Master) is a PMI certification from the Disciplined Agile toolkit. Where Scrum imposes a framework, Disciplined Agile helps the team choose the way of working best suited to its context: a pragmatic approach to agility.

It is a good entry point to understand agility flexibly, without limiting yourself to a single method.

Who is the DASM for?

The DASM is for anyone starting out or wanting to structure their agile practice, with no prerequisite.

  • Beginners in agility who want solid foundations
  • Agile team members
  • Project managers transitioning to agility
  • Professionals who want an adaptable approach, not a rigid framework

Eligibility

The DASM is accessible: no prior experience is required. You simply take the training, which includes exam access, through a PMI Authorized Training Partner.

The DASM exam

The DASM exam has 50 multiple-choice questions in 120 minutes. A key feature: it is taken entirely online, unproctored, whenever you want (you have 30 days after receiving the link, with retake attempts). There is therefore no test centre to attend.

The certification is valid for one year and is maintained with 7 agile PDUs per year.

How much does the DASM cost?

The cost includes the training, which includes exam access. The Atypix training price:

SenegalF CFA 500,000
BeninF CFA 400,000

Price of the training and support. The examination fee paid to PMI is invoiced separately.

How to prepare with Atypix

Atypix is a PMI Authorized Training Partner: the training (16 hours) uses official Disciplined Agile material, bilingual French / English, in person in Montreal, Dakar and Cotonou or remotely. As the exam is online, no travel is needed.

  • Official 16-hour training, exam included
  • No prerequisite, open to all
  • 100% online, unproctored exam, taken whenever you want
  • PMI Authorized Training Partner

Upcoming sessions

No session scheduled right now. Contact us for the next dates.

See the course and enrol

Frequently asked questions

Do I need experience to take the DASM?
No. The DASM requires no prior experience. You simply take the training, which includes exam access.
How does the DASM exam work?
50 multiple-choice questions, 120 minutes, entirely online and unproctored: you take it whenever you want, within 30 days of receiving the link. There is no test centre to attend.
Is the DASM exam taken at the Dakar Pearson VUE centre?
No. The DASM is an unproctored online exam: you take it from home, whenever you want. Preparation itself takes place with Atypix in Dakar, Cotonou or remotely.
What is the difference between DASM and PSM I?
PSM I certifies mastery of Scrum specifically. The DASM, from Disciplined Agile (PMI), helps you choose the way of working best suited to your context, beyond a single framework.
Do I need to renew the DASM?
Yes. The certification is valid for one year and is maintained with 7 agile PDUs per year.

Official source and up-to-date requirements: PMI, DASM certification

Ready to start with the DASM?

Our advisors point you to the next session, in Dakar, Cotonou or remotely.