Tailoring Processes Considerations: Adapting Project Life Cycles
PMBOK v8 Definition
Tailoring is the deliberate adaptation of the project management approach, governance, and processes to make them more suitable for the given environment and the work at hand. The PMBOK v8 defines tailoring considerations as the factors that project teams evaluate to determine which processes, tools, and techniques are appropriate for a specific project, including the project's size, complexity, risk, and stakeholder requirements.
Why It Matters for the Exam
Tailoring considerations appear frequently in PMI exam questions that test your ability to adapt standard processes to real-world project conditions. These questions typically present a scenario with specific project characteristics (e.g., small team, high uncertainty, regulatory environment) and ask which processes should be adapted or which tailoring factor is most relevant.
Key Points to Remember (for the exam)
- Primary Tailoring Factors: Project size, complexity, risk level, regulatory requirements, organizational culture, and stakeholder expectations
- Tailoring Decision Process: Evaluate project characteristics → Select appropriate processes → Determine level of formality → Adapt documentation → Validate with stakeholders
- Common Tailoring Areas: Life cycle approach (predictive vs. adaptive), level of documentation, frequency of reviews, team structure, and reporting cadence
- Tailoring vs. Customization: Tailoring adapts PMBOK processes to the project; customization modifies deliverables or products
- Governance Impact: Organizational governance structures influence which processes can be tailored and to what degree
- Continuous Tailoring: Tailoring is not a one-time activity; it should be revisited as project conditions change
Typical PMI Exam Example
A project manager is assigned to a small, low-risk software development project with an experienced team. The organization requires all projects to follow a predictive life cycle. Which tailoring consideration should the project manager evaluate first?
Answer: The project manager should evaluate the project's size and complexity to determine if a less formal approach to planning and documentation is appropriate while still meeting organizational governance requirements.
PMI Exam Traps
-
Trap: Confusing tailoring with scope creep
- Reality: Tailoring is a deliberate adaptation of processes; scope creep is uncontrolled expansion of deliverables
-
Trap: Believing all processes must be applied equally to all projects
- Reality: Tailoring allows teams to select and adapt processes based on project needs; not all processes are mandatory for every project
-
Trap: Thinking tailoring only applies to adaptive (agile) projects
- Reality: Tailoring applies to all project types, including predictive, hybrid, and adaptive approaches
-
Trap: Assuming tailoring is a one-time activity at project initiation
- Reality: Tailoring should be continuously evaluated and adjusted throughout the project life cycle
Important PMI Connections
| Related Concept | Relationship Type | Exam Attention Point |
|---|---|---|
| Development Approach (Section 2.1) | Determines tailoring options | Predictive vs. adaptive approaches require different tailoring decisions |
| Governance (Section 2.2) | Constrains tailoring scope | Organizational governance defines boundaries for process adaptation |
| Schedule Performance Domain (Section 2.3) | Affected by tailoring decisions | Tailoring the level of schedule detail impacts tracking and control |
| Finance Performance Domain (Section 2.4) | Influences tailoring priorities | Budget constraints may require tailoring of reporting and documentation processes |
| Resources Performance Domain (Section 2.6) | Input to tailoring decisions | Team size and skill level determine appropriate process formality |
Quick Review Questions
-
A project has a very small team (3 people) and low complexity. Which tailoring consideration is most important when deciding how to document requirements?
-
During project execution, the team realizes the original tailoring decisions are causing excessive documentation. What should the project manager do?
-
An organization has strict governance requirements for all projects. How does this affect the tailoring process?
-
A project manager is choosing between a predictive and adaptive life cycle. How does this decision relate to tailoring considerations?
-
What is the difference between tailoring project management processes and customizing project deliverables?
PMBOK v8 Reference
Section 2.7 - Tailoring Processes Considerations (Includes subsections 2.7.1 Key Concepts, 2.7.2 Processes, 2.7.3 Tailoring Considerations, 2.7.4 Interactions With Other Domains, 2.7.5 Check Results)