
Project Dashboards: Charts, RAG Status, and Performance Metrics
PMBOK v8 Definition
A project dashboard is a set of charts and graphs showing progress or performance against important measures of the project. It is a common way of showing large quantities of information on metrics. Dashboards generally collect information electronically and generate charts that depict status. Often, dashboards offer high-level summaries of data and allow drill-down analysis into contributing data. Dashboards often include information displayed as stoplight charts (also known as red–amber–green [RAG] charts), bar charts, pie charts, and control charts.
Why It Matters for the Exam
Project dashboards appear frequently in PMI exam questions related to monitoring and controlling project work and communicating performance to stakeholders. Questions test your understanding of how dashboards differ from other reporting tools, what types of charts they contain, and how they support decision-making. Expect scenario-based questions where you must identify the appropriate visual tool for a given situation.
Key Points to Remember (for the exam)
-
Definition Core: A dashboard is a set of charts/graphs showing progress or performance against important measures. It is NOT a single chart—it is a collection of visual indicators.
-
Primary Purpose: Dashboards show large quantities of information on metrics at a glance. They provide high-level summaries with drill-down capability.
-
Common Chart Types: Dashboards include stoplight charts (RAG charts), bar charts, pie charts, and control charts. RAG status (red/amber/green) is specifically mentioned as a common dashboard element.
-
Electronic Collection: Dashboards collect information electronically and generate charts that depict status. This distinguishes them from manual reporting methods.
-
Drill-Down Capability: Dashboards offer high-level summaries AND allow drill-down analysis into contributing data. This two-level functionality is a key feature tested on the exam.
-
NOT a PMIS: A dashboard is a reporting output, NOT the Project Management Information System (PMIS) itself. The PMIS is the system that gathers, integrates, and disseminates outputs; dashboards are one type of output.
-
Performance Focus: Dashboards show progress against important measures—typically key performance indicators (KPIs) related to scope, schedule, cost, and quality.
Typical PMI Exam Example
A project manager needs to communicate project status to senior management in a single visual display. The dashboard shows schedule progress as a bar chart, budget variance as a RAG status (green for on track), and quality metrics as a control chart. Senior management can see the overall status immediately and click through to investigate specific issues. Which tool is being used? → Project dashboard.
PMI Exam Traps
-
Trap: Confusing a project dashboard with a project report or status report. Reality: A report is text-based with narrative; a dashboard is visual with charts and graphs showing metrics.
-
Trap: Thinking a dashboard is the same as the PMIS. Reality: The PMIS is the system (software/tools) that gathers, integrates, and disseminates outputs. A dashboard is one OUTPUT of the PMIS.
-
Trap: Assuming dashboards only show high-level data without detail. Reality: Dashboards offer high-level summaries AND allow drill-down analysis into contributing data.
-
Trap: Confusing RAG charts (red-amber-green) with control charts. Reality: RAG charts show status against thresholds (go/no-go); control charts show process stability over time with control limits. Both can appear on the same dashboard.
Important PMI Connections
| Related Concept | Relationship Type | Exam Attention Point |
|---|---|---|
| Project Management Information System (PMIS) | Tool/System that produces dashboards | PMIS gathers and integrates data; dashboards display that data visually |
| Key Performance Indicators (KPIs) | Metrics displayed on dashboards | Automated gathering and reporting on KPIs can be part of the PMIS |
| Project Reporting | Complementary process | Project reporting is the act of collecting and distributing project information; dashboards are a format for presenting that information |
| Stoplight Charts (RAG) | Specific chart type within dashboards | RAG charts are explicitly named as a common dashboard element—red=critical, amber=warning, green=on track |
Quick Review Questions
-
What is the primary difference between a project dashboard and a project status report?
-
A dashboard shows a red-amber-green indicator for budget performance. What type of chart is this called in PMBOK v8?
-
Can a dashboard provide both high-level summaries and detailed data? How?
-
A project manager uses scheduling software to collect data and generate a dashboard. Is this scheduling software considered the PMIS or a component of the PMIS?
-
Name four types of charts commonly found on project dashboards according to PMBOK v8.
PMBOK v8 Reference
Section 5 – Tools and Techniques, "Project dashboards" (pages 190-191)
A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Seventh Edition